Economic Challenges and Opportunities in the 300 mm Transition

Iddo Hadar, Jaim Nulman, Kunio Achiwa, and Oded Turbahn, Applied Materials Inc. -- Semiconductor International, 10/1/1998

W ith development risk fully borne by the equipment industry and a two-year delay in the main deployment of 300 mm equipment, the wafer size transition runs the risk of allowing low or non-existent return on investment for semiconductor equipment manufacturers if a cost ratio of 1.3X the cost of 200 mm equipment must be realized. As a result, the equipment industry may have insufficient capital needed to invest in <0.15 µm technology, advanced materials and processes and the eventual transition to 450 mm wafers. Higher tool cost multipliers are clearly affordable. For example, a 300 mm fab producing 256 Mb DRAMs could offer an incremental profit margin of $3.6-$1.3/cm2 with a multiplier in the 1.4-2.0 range. Therefore, there is an excellent opportunity for win-win situations.

300 mm Challenges

Click for larger image.
Fig. 2. Equipment industry R&D spending has surged by 30%/year from 1993 to 1997. (Source: Equipment industry annual financial reports, VLSI Research, DataQuest, others)
1. Concentrated risk
A key problem burdening the industry's equipment supplier/device manufacturer interdependence is continuous shifting of responsibility for technical advances to key equipment suppliers1. In past wafer size transitions, customers shared risk and development costs with equipment manufacturers, along with development of key technologies at Bell Labs, NTT and IBM's T.J. Watson Research Labs. In the 200 to 300 mm transition however, semiconductor manufacturers dedicate R&D dollars almost exclusively to IC design, process integration, yield enhancement, etc., leaving the bulk of the 300 mm R&D burden to equipment manufacturers.

2. Technical barriers
The 200/300 mm transition is not simply a scaling effort; it involves fundamental technology shifts. For logic ICs, these include:

  • Copper-based interconnects instead of traditional aluminum alloys,

  • Low-k (<3.0) and ultra-low-k(<2.6) interlevel dielectrics,

  • Low-resistivity contact materials: Ni or Co instead of Ti,

  • Low-resistivity gate materials,

  • Gate oxides below 40 Å with diffusion barriers and

  • Shallow junctions with raised sources and drains.

    Click for larger image.
    Fig. 3. ASP multipliers for 150 to 200 mm (actual) and 200 to 300 mm, as requested by IC manufacturers.
    For DRAM devices, the changes include:

  • New storage capacitor materials: tantalum pentoxide (Ta2O 5), barium strontium titanate (BST) and platinum zirconium titanate (PZT);

  • New electrode materials: platinum, HSG and TiN;

  • Vertical stack or very high aspect ratio trench capacitors and

  • High aspect ratio (. 10:1) contacts.

    Another critical issue is the immaturity of optical lithography's calcium fluoride lenses for argon fluoride laser (193 nm) exposure. Further, high IC manufacturing yields (with aggressive device scaling) demand high precision and high throughput metrology.

    3. Transition timing uncertainty
    Originally, the 300 mm wafer transition was expected to occur coincidentally with 0.25 or 0.18 µm processes. It now appears that DRAM ICs will have device dimensions in the 0.18 to 0.15 µm range, while logic devices will be in the 0.15 to 0.13 µm range. Several factors are affecting the timing of this transition, including:

    Click for larger image.
    Fig. 4. ROI through 2003 as a function of the 300/200 mm tool ASP multiplier and rate of adoption: 22% by 2003 (medium rate), one-year delay or one-year acceleration.
    Click for larger image.

    Fig. 5. DRAM price trend indicates a 256 Mb DRAM will sell for $25-$30 in 2001 (about 10 cents per Mb).

    • Continued focus on rapid critical dimension shrinkage with 200 mm technology, therefore a need to develop ne

      w technologies simultaneously for 200 and 300 mm equipment;
    • Lack of 300 mm equipment with comparable maturity to that of 200 mm equipment (especially unavailability of lithography tools with wafer throughput <80 wafers per hour;

    • 200 mm IC production over capacity;

    • Economic problems in Asia and

    • IC pricing impact of the sub-$1000 personal computer.

    As a result, the bulk of 300 mm pilot lines will start taking equipment deliveries by the first and second quarters of 2000, a full two-year delay, as compared to the July 1997 forecasts (Fig. 1), with operational capabilities three to six months later and mass production beginning in the first half of 2002.

    Implications

    Total R&D spending by the wafer fab equipment industry increased by over 30% per year from 1993 to 1997 and could reach $3.6 billion per by 2000 (Fig. 2). Of course, the only means of funding such investment is via the revenue generated by tool sales. In the transition from 150 to 200 mm, the equipment average selling price (ASP) multiplier averaged 1.18, with virtually no changes in manufacturing materials or structures (Fig. 3). For the shift to 300 mm, IC manufacturers are requesting a multiplier of 1.3 or less 2. Given the stated requirements for 300 mm technology, the equipment industry's investment in 300 mm equipment development and commercialization from 1996 through 2001 could exceed current estimates of $4.3 billion easily.

    Click for larger image.
    Fig. 6. Each 200 mm wafer costs about $1600 to manufacture, while each good 256 Mb die costs about $15 per cm2 (calculation based on fundamental analysis of IC manufacturing investment and processing costs).
    Click for larger image.

    Fig. 7. Estimated throughput for 300 mm equipment relative to its 200 mm counterpart, based on industry-wide analysis and subject to limitations of scan speed and batch size.

    Click for larger image.
    Fig. 8. When comparing production of DRAMs on 200 vs. 300 mm wafers, the DRAM producer gains incremental value - additional margin of good die per square centimeter - right up to a 300/200 mm price multiple of 2.4.
    The return on this investment (ROI) would be less than 5%, assuming 300 mm technology becomes 22% of the equipment market by 2003 3. If that level of penetration takes an additional year to materialize (as current pilot/manufacturing timelines indicate), even a 1.55 ASP multiplier results in zero ROI by 2003; a 1.3 multiplier would yield ROI in the negative two-digit range (Fig. 4).

    In addition, the 1.3X price multiplier will inhibit the equipment industry's ability to provide timely, advanced technology manufacturing equipment with necessary scaling beyond 0.15 µm. R&D funding for the 300/450 mm transition, expected by SEMATECH to begin in 2008, will be scarce also. Finally, slim 300 mm profits may force further consolidation among equipment suppliers.

    300 mm Win-win opportunities

    So, is 300 mm a bad deal? Not at all. A realistic examination of risks and rewards indicates an opportunity for a "win-win" scenario for both semiconductor IC manufacturing and equipment industries. In it, the equipment industry earns profits it needs to advance state of the art and manage new investments, while semiconductor manufacturers benefit from lower production costs to earn a substantial return.

    The economic factors driving larger wafer transitions are straightforward. A greater number of dice per wafer allows greater production of ICs, assuming the same wafer throughput. If costs increase by x%, and the number of ICs increases by y%, and y >x, cost per die decreases (by 100%-(100%-x)/(100%-y), to be precise).

    Since DRAM devices suffer from the highest price erosion and therefore pose the highest manufacturing cost pressure, we considered a 256 Mb DRAM fab using 0.18 µm design rules in our analysis4. ASP of a 256 Mb DRAM in (early) 2001 is estimated to be $25-$30, based on extrapolation of current 16 and 64 Mb DRAM price trends (Fig. 5). If we assume a die size of 100-120 mm2, the ASP per unit area is $25/cm2 on 200 mm wafers. These 2001 estimates are consistent with expected volumes and technology maturity.*

    Volume manufacturing cost of 256 Mb DRAMs on 200 mm wafers would be nearly $1600/wafer, or a good die cost of close to $15/cm2 (Fig. 6) and a margin of about $10/cm2. Tool depreciation and maintenance account for over half of the total cost. Key yield assumptions and tool throughput numbers for the 200 mm baseline fab and its 300 mm equivalent are shown in Table 1 and Figure 7, respectively. We assumed lower line yield (91% vs. 92%) and probe yield (86% vs. 89%) for the first generation of 300 mm fabs vs. 200 mm.

    The number of dice per wafer provided by 300 mm relative to 200 mm wafers is 2.35X. The transition potentially benefits DRAM manufacturers via lower fab depreciation and maintenance costs (Fig.8). Based on this fundamental data, this analysis indicates that at the extreme case (if 300 mm tool prices are identical to 200 mm tool prices, ie., multiplier of 1.0), the DRAM manufacturer could obtain an incremental value, or additional margin, of about $5/cm 2. However, this tool cost multiplier of 1.0 would reduce the margin of the semiconductor equipment industry by over 55%, limiting its ability to invest in R&D for sub-0.15 µm technology.

    Table 1.
    256 Mbit DRAM: 200 vs. 300 mm
    Design rule micron 0.18 0.18
    Wafer size mm 200 300
    Wafer area mm 2 31,419 70,683
    Die size mm 2 120 120
    Gross die per wafer pcs 223 548
    Probe yield % 89 86
    Line yield % 92 91
    Wafer starts Wafers/wk 6000 6000
    Wafer outs Wafers/wk 5520 5460
    Utilization % 92 92
    Good die per wafer pcs 198 471
    Wafer cost $ 100 600
    IC revenue $/cm2 25 25
    Obtainable chip ratio   1.00 2.35
    Instead, incremental revenue for the 256 Mb DRAM case can be distributed between IC manufacturers and the equipment industry in a way that results in a competitive equipment industry, capable of meeting industry demands, including a reduction of manufacturing cost per die. The data from Figure 8 indicate that a 300 mm tool price multiplier in the 1.4-2.0 range would give a manufacturer of 256 Mb DRAMs an incremental value in the $3.6-$1.3/cm2 range respectively, enabling a win-win scenario for both industries (Table 2).

    Summary

    The 200 to 300 mm wafer size transition is occurring coincidentally with significant device technology, processing and materials changes. In addition, semiconductor industry behavior in sponsorship, leadership and risk-taking has changed. No longer is one IC company willing to lead the effort. The industry carries the bulk of the investment burden (an estimated investment of $4.3 billion from 1996 to 2001). This risk is exacerbated further by the IC industry's expectation for a 300 mm tool price of <1.3X the 200 mm tool price and delays in starting pilot manufacturing lines. The return on the equipment industry's investment is at risk of being below 5% by 2003, limiting its ability to invest in R&D and technology commercialization beyond 0.15 µm.

    A win-win situation for both the IC manufacturing and equipment industries can be achieved for 300 mm tool price multipliers in the 1.4-2.0 range. Semiconductor manufacturers that quickly seize the 300 mm opportunity will boost financial returns significantly while ensuring long-term availability of key suppliers of process technology.

    Table 2. Model Results
      200 mm 300 mm
    Area factor 1.0 2.35
    IC manufacturers' cost factor target 1.0 1.30
    Equipment cost factor forecast 1.0 1.4-2.0
    IC manufacturers' incremental value ($/cm2) -- 3.6-1.3
    *However, 256 Mb DRAM pricing and timing could change due to emergence of the 128 Mb DRAM and possible changes in device demand. The revenue value for logic, especially for microprocessors, is even higher.

    References

    1. D. A. Hicks, "Evolving Complexity and Cost Dynamics in the Semiconductor Industry," IEEE Trans. Semiconductor Manufacturing, Vol. 9, No. 3, August 1996, p. 294.
    2. D. Seligson, "The Economics of 300 mm Processing," Semiconductor International, January 1998, p. 52.
    3. Dataquest, Industry Strategy Symposium, Monterey, Calif., January 1998.
    4. 1997 National Technology Roadmap for Semiconductors, SIA, November 1997.

    Hadar Iddo T. Hadar is senior director of corporate strategy at Applied Materials Inc. He received his masters in business administration from Stanford University and his bachelor's degree in management-economics from Tel-Aviv University. Over the last 10 years he has engaged in strategic analysis and planning in the electronics, semiconductor and fab equipment industries.
    Nulman Dr. Jaim Nulman is vice president and general manager of the 300 mm programs office for Applied Materials. Prior to this he was managing director and global product manager for PVD. Nulman also served as chairman of the business process development committee for Applied products. Prior to these assignments, he served as manager of process technology integration for the Endura PVD System. He joined Applied Materials in 1989; before joining, he worked with AG Associate for four years, as technology manager of new process applications and RTP technology development. Nulman received his bachelor's degree in electrical engineering from the Technicon-Israel Institute of Technology and his master's and doctorate in electrical engineering from Cornell University. He continued for two years as a research associate with Cornell's School of Electrical Engineering and the National Submicron Facility, where he worked on advanced technologies for submicron silicon and III-V devices. Nulman also is a graduate of Stanford's Executive Program.
    Achiwa Kunio Achiwa is director of corporate marketing at Applied Materials Japan Inc. He has engaged in marketing analysis of the electronics, semiconductor and wafer fab equipment industries since 1995. Before joining AMJ, he worked for Dataquest as director of the semiconductor analysis group and senior analyst of the Semiconductor Equipment and Materials Service. He has 20 years experience in the semiconductor industry. Achiwa received his bachelor's degree in science and engineering from Waseda University.
     

    Oded Turbahn is director of the 300 mm programs office at Applied Materials. Before joining Applied Materials, he worked for Hanita Coatings as managing director and Kulicke & Soffa as product manager of die bonders. He received his bachelor's degree at the Technion Israel Institute of Technology.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

There are no other articles written by this author.

SPONSORED LINKS



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Videos

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Videos

Advertisements





NEWSLETTERS
Plug in and get the latest SI news, trends and industry updates delivered free, directly to your inbox!

SI NewsBreak and Special Reports (Weekdays)
Wafer Processing Report (Monthly)
Lithography Report (Monthly)
Metrology Report (Monthly)
Clean Processing Report (Monthly)
Packaging Report (Twice Monthly)
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites