Carrier Replacement Improves Yield and Tool Availability
Ed Merrill, Jim Bostwick IBM Microelectronics Division., Essex Junction, Vt. Chad Gilhoi, Kirk Mikkelsen Entegris Inc., Chaska, Minn. -- Semiconductor International, 6/1/2001
| At a Glance | |||
| |||
Although the carrier and box problems were obvious to IBM fab personnel, a cost justification was required for management. IBM put a great deal of effort into determining yield loss, estimated at 1-2% on selected products. The throughput loss was not estimated as part of the initial justification, even though we expected some improvement.
Once justified, IBM was able to obtain the financial support needed to upgrade the carriers and boxes. IBM engineers then evaluated many commercially available carriers and boxes, and finally chose a product combination provided by Entegris (Fig. 1). Due to the critical nature of the change to a new carrier and box in such a large fab, a detailed conversion plan was needed. IBM and Entegris formed a team to plan and execute the conversion. The plan, which covered all logistics and tool readiness, took several months to develop and implement. Thorough preparation allowed us to complete the conversion in less than 18 hours, with minimal disruption to the fab. Upon conversion, the fab realized significant improvements in yield and tool availability.
Carrier and box selection
IBM engineers judged carrier and box performance based primarily on the material's ability to maintain dimensions over time, and its abrasion resistance to various surfaces. The new carrier and box also had to offer equal or better outgassing properties, low or lower extractable anion/cation contamination levels, and equal or better thermal capabilities. IBM chose a carbon-fiber-filled polyetheretherketone (CF/PEEK) carrier primarily for its quality of dimensional stability, high abrasion resistance and low particle generation.
This particular model of carrier also had the desired compatibility with the existing toolset and the capability of handling the necessary temperatures, leading to shorter wafer-cooling times and increased throughput. A CF/PP box was selected for its low particle levels and compatibility with the existing automated material-handling system. This box, in combination with the CF/PEEK carrier, also generated low particle levels.
| 1. The dimensional stability and contamination properties of wafer carriers and boxes affect the yield and tool availability of production fabs. (Source: Entegris) |
Maintaining physical dimensions over time is critical to minimizing particle generation from wafers rubbing against the carriers during pick-and-place operations. In severe cases, wafer scratching and breakage occurs during wafer moves. Dimensional changes also cause tool interruptions, requiring the assistance of an operator to restart the tool.
To account for the dimensional variation in the large population of carriers, long tool teaching and calibration times were required at IBM. The magnitude of the problem caused by dimensional variation in the old carriers was so great that some tools had special fixtures for the input/output stages that actually clamped the carriers to create a predictable wafer location.
Various tests were performed to predict the dimensional performance of carriers over time. In one test, a constant load was applied to carriers and dimensional changes over time then were monitored.1
| 2. The PEEK material's tensile modulus is >5× that of carbon-powder-filled polypropylene (CP/PP), resulting in better dimensional stability. |
Particle performance
Carrier resistance to abrasion was critical for selecting the new carrier and box. Of particular importance was the carrier's resistance to abrasion by the wafers, which can directly cause defects and yield loss. The particles generated can also adhere to the wafer backside, near the edge, causing focus problems during the lithography steps.
The abrasion resistance of CP/PP vs. CF/PEEK materials was tested by intentionally abrading wafers with polished edges against the carriers for 1000 insertions and extractions. To ensure that abrasion occurred, after initial contact between the wafer and carrier, the wafer-handling robot was lowered an additional 0.020 in.
|
|
Similar performance was seen where caustic etch wafers with ground edges were abraded against carriers.2 This reference also compares performance of various carriers to abrasion against other surfaces such as stainless steel and sharp objects.
Conversion planning
Because of the size of the conversion and the risk to the fab, IBM sought a process that would minimize throughput loss while maximizing the benefits of the upgrade. A team of IBM and Entegris personnel planned the conversion, which took about three months.
The team first addressed the method used to introduce new boxes and carriers into the line. After considering many options, including gradual bay-by-bay conversion and attrition, we ultimately decided on mass change-out of carriers. The team changed the boxes before the carriers, thereby limiting the amount of work to be done on the actual day of carrier conversion. The conversion process consisted of two major aspects: logistics and tool readiness.
Logistics
Given the goal of changing out 17,000 carriers in less than 24 hours, a significant amount of logistics planning was required. We formed teams with representatives from manufacturing, engineering, safety, and other affected departments to determine how to best execute the mass change-out of carriers. The main considerations were as follows:
- Resource planning— Determining the number of people required for the conversion.
- Number of carriers needed— There were many dormant and engineering lots in the fab that needed purging prior to conversion.
- Training— It was important to alert everyone in the fab prior to conversion that the change-out would occur. IBM and Entegris produced a training video to familiarize everyone with the new carriers and boxes. The new carrier was also put on display in a number of locations to heighten awareness.
- Transfer equipment— We needed a quick, non-contaminating wafer-transfer method that could be performed throughout the fab. Entegris provided temporary transfer tools for the day of conversion. We performed transfers on specially build carts, which acted as movable work surfaces.
- Manufacturing, storage and staging of carriers— It was critical that all 17,000 carriers and boxes be provided on time and that they arrived clean and fab-ready. Further, the carriers and boxes had to be unpacked and stored in strategic locations throughout the fab to ensure quick access during conversion.
Tool readiness
Making sure the process tools were ready to accommodate the new carriers was perhaps the toughest part of the conversion process. With more than 1800 process tools, it was critical to thoroughly track the compatibility of the tools in the fab. While the new CF/PEEK carrier was a very close model to the carrier we used previously, slight differences in tolerances and non-standard interface features had the potential to cause interface issues.
After a preliminary audit performed by IBM and Entegris, carrier samples were distributed to the tool owners to check compatibility. We then implemented a tracking system to monitor the progress of the tool-readiness effort and to provide visibility to management on tool status.
While most tools could interchangeably run both the new and the old carriers, several toolsets required modifications to accommodate the new carrier. Also, tools with highly sensitive wafer-handling systems required re-calibration for the new carriers. Entegris and IBM worked very closely with the OEMs and on-site maintenance teams to resolve all tool-interface issues prior to conversion.
Implementation
To make carrier conversion run more smoothly and to reduce workload, we converted the boxes in a span of three months prior to carrier conversion. New boxes were introduced at the run-start and box-clean areas.
The carrier conversion was scheduled to take place over a 24-hour period during full production mode (i.e., products continued to run on tools throughout the day). The actual conversion went very smoothly with minimal loss of production or wafer breakage.
All participants were provided with clear responsibilities prior to the conversion. Approximately 20 teams of three people were formed to carry out the actual wafer-transfer process. Additional personnel (60-70 people) supported the conversion activities by supplying/disposing of carriers, troubleshooting interface issues and coordinating resources.
| 4. The new PEEK carriers allowed a significant reduction in levels of foreign material on the wafers. |
Utilization/yield improvement
Figure 4 shows the reduction in FM achieved through the conversion, with vertical lines indicating the start and completion of the conversion. When improvements from general fab learning are excluded (as shown in the figure), the reduction in FM is >35%.
IBM also achieved significant improvements in equipment utilization. Table 1 shows the pre- and post-conversion numbers for tool failures. The average reduction in failures for selected critical tools was 62%, equating to a 1.1% improvement in tool availability, calculated using standard SEMATECH models (Table 2).
| Table 1. Tool Failure Improvements | |||
| Tool type | Prior failures | Post failures | Change |
| HDP | 66 | 20 | 70.0% |
| Sputter wiring | 47 | 21 | 55.0% |
| Sputter liner | 29 | 23 | 21.0% |
| Etch | 41 | 8 | 80.0% |
| Photo | 39 | 12 | 69.0% |
| Average | 222 | 84 | 62.0% |
| Table 2. Increase in Tool Availability | ||
| Tool type | # of tools | Change |
| HDP | 6 | 3.4% |
| Sputter wiring | 12 | 3.2% |
| Sputter liner | 12 | 0.2% |
| HDP speed | 9 | 4.6% |
| HDP 6 | 6 | 0.8% |
| HDP 8 | 9 | 4.6% |
| Etch | 63 | 2.5% |
| Hot-process tools | 13 | 0.4% |
| Photo | 85 | 0.4% |
| Average | 21.5 | 1.1% |
| 5. Yield improvement for two devices over time. Analysis of all products showed improvements as high as 8%. |
Conclusion
Through teamwork and planning, IBM and Entegris successfully converted two fabs to a new wafer-carrier and storage-box technology. Approximately three months of planning by the team enabled a conversion of all carriers in an 18-hour period during normal production, with minimal loss in output.
Most important, foreign-material problems and carrier dimensional variation were reduced, leading to yield gains and increased tool availability. With the higher-than-expected yield and tool-availability improvements in place, IBM realized a return on investment well within its acceptable timeframe.
A form of this article was originally published in IBM MicroNews, Vol. 7, No. 1, February 2001. A version was also presented at the IEEE/SEMI Advanced Semiconductor Manufacturing Conference, September 2000.
Ed Merrillis the manger of the fab engineering department at IBM Microelectronics. His responsibilities include tactical and strategic capacity planning, contamination control, capital purchases and site technical editing.Jim Bostwickis a senior technical specialist with equipment engineering with IBM Microelectronics. His responsibilities include mini-environments, reticle, mask automation, and 200 mm and 300 mm wafer handling.
Chad Gilhoiis the manager of global services for Entegris' Microelectronics Group. He is responsible for marketing and implementing wafer-handling service programs to help customers optimize factory performance. Gilhoi earned his bachelor's degree in mechanical engineering from the University of Minnesota.
Phone: 1-952-556-4421
Kirk Mikkelsenis the manager of Entegris' product test laboratory. His lab is responsible for characterizing the physical, pressure, electrical, thermal and contamination properties of Entegris' products. In his 10 years with the company, he has held positions as senior materials engineer and 200 mm pod program manager. Mikkelsen has written several articles and holds five patents. He has a bachelor's degree in chemical engineering from the University of Minnesota.
Phone: 1-952-556-8037
REFERENCES
- P. Jones, et al, "Evaluating Polyetheretherketone (PEEK)-Based Transport and Storage Wafer Carriers," Microcontamination, January 1993.
- K.J. Mikkelsen, "Evaluating New Wafer Carrier and Storage Box Materials," Micro, March 1996.